ACR-News
Know what you want? Try our 'Supplier Directory' 
folder Air conditioning, Case studies

Boston United FC equipped with premier air condition solution

Boston United Football Club’s new Jakemans Community Stadium west stand has been equipped with a high efficiency premier air conditioning system by Toshiba.

The Super Heat Recovery Multi (SHRM-e) variable refrigerant flow (VRF) solution, installed by Formost Air Conditioning Ltd, will provide outstanding indoor comfort for fans and visitors as part of the brand new ground and stadium development.

Facilities include a banqueting room, lounge, boardroom, community hub and four hospitality suites, all air conditioned to the highest standards with a combination of Toshiba SHRM-e systems linked to the company’s VN heat recovery fresh air ventilation units.

The VN systems harness energy from exhaust air to pre-condition incoming fresh air, integrating with the heat recovery VRF system to create a total building solution. Use of the VN units reduces the cooling and heating load and the overall size of the air conditioning system required, saving energy and reducing capital costs.

“The aim is to give our fans the best ground we can,” said David Newton, Boston United chairman. “Providing a comfortable indoor climate for visitors and their guests is a key part of the experience.”

The Pilgrims’ new stadium is being built to Football League standards with increased capacity of over 5000. It will provide a range of community, sports, education and training programs, plus in due course a sports hall and an all-weather 3G pitch for community use.

“We positioned the outdoor condensing units installed at either end of the new stadium, with plenty of space for connections and access,” said Simon Murphy, who headed the installation for Formost Air Conditioning Ltd. “Toshiba offers a great combination of quality, reliability and competitive pricing. We have been installing Toshiba air conditioning equipment for many years, ever since we were established, and it is a brand we can always trust to perform and do a great job.”

The new Jakemans Community Stadium is part of the area’s wider Quadrant development, which includes housing, a hotel, petrol station, a care home and retail units.

Comments

Already Registered?
Sign In
Not Yet Registered?
Register

The IOR Annual Conference – a conference on-demand

Delegates to the IOR Annual Conference taking place from 21 to 22 April will get the chance to access the event live and all sessions and recordings for up six months afterwards providing fantastic value and allowing anyone registering for the event ...

  01-Apr-2021

Thunder: the full inverter reversible R290 heat pump from 40 to 85 kW

Thunder is the newest solution from Clivet, designed with full-inverter technology on latest-generation scroll compressors and axial fans....

  24-Apr-2024

Customised Consulting TM44 Inspection Services

Customised Consulting are accredited to provide TM44 Inspection Services ((also known as Air Conditioning Energy Assessments (ACEA)) for both simple (level 3) and complex (level 4) systems for buildings and can provide competitive quotes in Weybridge, Surrey, Sussex, London and Kent.
  25-Apr-2024
ACR News is the number one magazine in the air conditioning and refrigeration industry. Don’t miss out, subscribe today!
Subcribe to ACR News

Diary

BESA National Conference