ACR-News

 

B&ES elects president for 2014/15

Andy Sneyd has been elected president of the Building & Engineering Services Association (B&ES) for 2014/15.

Andy Sneyd has been elected president of the Building & Engineering Services Association (B&ES) for 2014/15.

Mr Sneyd has more than 25 years’ experience of the sector and is a chartered engineer and a fellow of the Chartered Institution of Building Services Engineers, with a Master of Science degree in building services engineering,.

Currently head of design for Crown House Technologies, Mr Sneyd manages the design and engineering aspects of mechanical, electrical and plumbing projects worth £300m annually and controls a design budget of more than £20m.

Having worked in engineering consultancy and product manufacturing, as well as in contracting, B&ES says that he brings to the presidency a profound understanding of a range of professional cultures, together with an ability to build and maintain complex stakeholder relationships.

He describes his current focus as “driving transformational change across the mechanical, electrical, plumbing and manufacturing aspects of Laing O’Rourke’s exemplar projects”.

Andy Sneyd also represents the interests of the UK’s major building engineering services contractors on the B&ES Council.

He was elected to the presidency at the annual general meeting of the Association, which was held in London on Thursday 10 July.

At the same meeting, Jim Marner of Shepherd Engineering Services became president elect, and Malcolm Thomson of Enigma Environmental Services was elected vice president. Bruce Bisset of Galloway Group will serve during 2014/15 as immediate past president.

The IOR Annual Conference – a conference on-demand

Delegates to the IOR Annual Conference taking place from 21 to 22 April will get the chance to access the event live and all sessions and recordings for up six months afterwards providing fantastic value and allowing anyone registering for the event ...

  01-Apr-2021

Webinar: Every cocoa bean counts.

Is your process up to today's challenges? Reduce losses in confectionery production by improving storage conditions....

  10-May-2024

Summer is coming - checklist for chillers in summer

With the warmer summer months coming, we recommend you give your chiller a good clean and inspection so equipment can operate efficiently and production can run smoothly.
  17-May-2024
https://www.acr-news.com/b-es-elects-president-for-201415