ACR-News

 

Grimsby Ice Factory in three-part feature

A three-part history of the Grimsby Ice factory is being featured on the Cooling Post website.
The series includes records from local archives and from J&E Hall, the Dartford company that installed the refrigeration plant during the 1930s electrification upgrade. Photos and drawings are also being used.

The first part examined the history of the Ice Factory and its refrigeration systems. Part 2 will explore in more detail the workings of the 1930s J&E Hall equipment, much of which still remains within the building. Finally, Part 3 will delve further back to information that has been unearthed on the original steam powered refrigeration system that has long since been lost to history.

http://www.coolingpost.com/features/iconic-refrigeration-frozen-in-time/

For more information about the Grimsby Ice Factory visit http://www.ggift.co.uk/

The IOR Annual Conference – a conference on-demand

Delegates to the IOR Annual Conference taking place from 21 to 22 April will get the chance to access the event live and all sessions and recordings for up six months afterwards providing fantastic value and allowing anyone registering for the event ...

  01-Apr-2021

Panasonic ECOi-W delivers sustainable cooling for East London Crown Court

A 200-year-old listed building that is home to an East London Crown Court, faced significant challenges with its outdated and inefficient air conditioning system that consisted of two large old chiller units and were looking for a more sustainable ...

  31-Oct-2025

Has your Chiller been checked for Refrigerant Leaks?

Has your Chiller been checked for Refrigerant Leaks?
  07-Aug-2025
https://www.acr-news.com/grimsby-ice-factory-in-three-part-feature