Chilled Distribution Warehouse

50,000m3 Logistics & Warehouse Distribution Centre operating at 2°C

Project duration was 22 weeks and provided an additional 5k pallets of chilled warehousing space & flexibility for the client. Linking into an existing building (via two insulated interconnecting tunnels with rapid rise doors), the fully cladded structure lined with Kingspan PIR insulated panels had to be carefully planned, so as not to disrupt existing operations.

 



Click here to find out more about: 1Cold Ltd
N.B. The information contained in this entry is provided by the above supplier, and does not necessarily reflect the views and opinions of the publisher