Project duration was 22 weeks and provided an additional 5k pallets of chilled warehousing space & flexibility for the client. Linking into an existing building (via two insulated interconnecting tunnels with rapid rise doors), the fully cladded structure lined with Kingspan PIR insulated panels had to be carefully planned, so as not to disrupt existing operations.